Your 10-Day Inspection Period: A Day-by-Day Plan

In this article

On a standard Arizona resale contract you get 10 days after acceptance to inspect, investigate and send your repair request. That sounds like plenty. It isn’t, if you wait until day six to book the inspection. Book it in the first day or two, get the report back within 24 hours, use the middle of the window for specialists and quotes, and have your BINSR ready a day or two before the deadline. Here’s how I’d lay it out.

How the clock works

Arizona REALTORS spells it out in their contract series on buyer due diligence: “The buyer’s inspection period is 10 days after Contract acceptance unless otherwise indicated.” Your agent may have written in a different number, so check your contract. Either way, the clock starts when the contract is accepted, not when you get around to calling an inspector.

The inspection period isn’t only for the home inspection. The same article lists what you’re expected to look into if it matters to you: homeowner’s insurance availability and cost (in writing), wood-destroying insects, the sewer connection, square footage, flood zone, and the state, county and city pool barrier rules. All of it has to happen inside those 10 days. And per Arizona REALTORS’ guide to the inspection period and buyer disapproval, all of your inspections have to be done before you deliver the BINSR.

Days 1 and 2: book everything at once

The day your offer is accepted, book the inspection. Don’t wait for the earnest money to clear or for the lender to call. Book these together so they happen on the same visit:

  • The home inspection. Every home inspection we do includes a termite (WDO) inspection, so that box on the contract gets checked the same day.
  • A sewer scope. A broken sewer line is an expensive surprise, and you can’t see it without a camera. Add a sewer camera inspection while I’m already there.
  • Add-ons that fit the house. A pool, solar, an older home, a vacant home. Ask about them when you book. See all of our inspection services.
  • An insurance quote. Call your agent now, not on day nine.

Also make sure the utilities will be on. If the gas, water or power is off, a lot of the house can’t be tested, and you’re stuck booking a second trip with fewer days left.

Days 2 to 4: inspection day and the report

Come to the inspection if you can, or at least come at the end so I can walk you through what I found. That’s why I’m there. Your report is delivered within 24 hours. Read it the day it lands.

Around this time the seller’s paperwork shows up too. Arizona REALTORS’ article on seller disclosures says the seller must deliver the Seller’s Property Disclosure Statement (SPDS) “within three days after contract acceptance” and the insurance claims history “within five days.” Read both next to your inspection report. If the seller checked “no” on past roof leaks and I found water stains on the ceiling, that’s a question for your agent.

Days 4 to 8: specialists and estimates

This is the part most buyers rush, and it’s where the money is. I’m a generalist. It’s my job to find the problem and refer you to the right professional. When the report says “have a licensed plumber evaluate,” that means get a plumber out there for an estimate before your period runs out.

You can see how this plays out in the video above. That house had a gas meter with a PVC extension on the regulator to get it 3 feet away from the electrical panel. It had loose stair treads on brand-new flooring, which is a fall hazard. After I turned on the furnace I could smell gas at the service, so that one went straight to the gas company. And the pool jets kept blowing air bubbles for over an hour, with leaks at the pump, so that’s a pool guy figuring out where the air is coming from. Each of those is a different phone call, and each call takes a day or two to get on someone’s schedule.

  • Call the trades the report names: plumber, electrician, roofer, HVAC tech, structural engineer, pool guy.
  • Ask for written estimates. A number on paper helps a lot more on a BINSR than “the inspector said it’s bad.”
  • Check every contractor’s license with the Arizona Registrar of Contractors, and make sure the license class covers the work.
  • Confirm insurance in writing. Insurers use a home’s claims history when they set your rate.

Days 8 to 10: sort the report and send the BINSR

No house is perfect, not even a new one. Your report will be long. Sort it the way I tell my clients: safety, water, structure and termites first. Then the big-ticket systems that are near the end of their life. Then everyday maintenance. Don’t stress out over the small stuff. If it’s a cheap fix, note it and move on. Spend your negotiating energy on the items that actually cost money or hurt someone.

Then sit down with your agent and write the BINSR. You list the items you disapprove of and pick whether to cancel or give the seller a chance to fix them. Sometimes it’s easier to just ask for a credit and hire your own contractor. Don’t send it on the last possible afternoon. If something goes wrong with signatures, you have no room left.

After the BINSR: the next deadlines

The same Arizona REALTORS guide lays out what comes next:

  • The seller has five days to respond, unless you agreed otherwise. No response counts as a refusal.
  • You then have five days after the seller’s response to cancel, or you’re moving forward.
  • Agreed repairs come with receipts delivered to you at least three days before closing, unless you agree on another number.
  • Verbal agreements don’t extend any of these deadlines. Only a written agreement signed by everyone does.

Arizona REALTORS also recommends doing your final walkthrough “at least three days prior” to close of escrow. If the seller did repairs, that’s a good time for a reinspection to make sure the work was actually done, and done right.

What to do today

  • Write your contract acceptance date on a calendar and count out 10 days, or whatever your contract says.
  • Book the inspection, termite check and sewer scope for the same visit.
  • Call your insurance agent.
  • Block out time on day three or four to read the report, the SPDS and the claims history together.
  • Line up specialists the same day the report arrives.

For more on the steps after the report, see what to do after the inspection.

Home inspections in Gilbert and across the Valley

We do home inspections and sewer scopes on the same visit in Gilbert, Queen Creek, Phoenix and across Arizona. Every home inspection includes a termite (WDO) inspection at no extra charge, plus a 1-year termite warranty through Firehouse Pest Control in Gilbert if no active termites are found.

Buying a home? Book your inspection online or call 623-399-0079.

Property Inspections Plus is a Gilbert, AZ home inspection company led by Certified Master Inspector Dan Pierce. We inspect homes across the East Valley, the Phoenix metro and the rest of Arizona. See all of our service areas.

Buying a home in the Phoenix area?

Get a Certified Master Inspector on your side. Every home inspection includes a termite inspection at no extra charge, thermal imaging and a report within 24 hours.

Related articles